Electrical Energy Storage (long duration)by Energy Dome SpA |
The Process |
CHARGE
|
DISCHARGE
|
CO2 Battery Standard frame available for the market20MW/200MWh Frame![]() |
The CO2 Battery services |
![]() |
|
First standard frame 20MW –200MWh CO2 Battery to startup in Sardinia Q3-2024PLANT TO BE UP AND RUNNING BY Q3-2024![]() |
The CO2 Battery is highly competitive against the 2 identified technology |
| CO2 Battery | Lithium-IonBattery | PumpedHydro | |
| BOP RTE | 75% | 80-85% | ~70-75% |
| EOP RTE | 75% | 68-73% | ~70-75% |
| CAPEX | Already 30% lower than li-Ion |
Highly volatile, currently >350 €/kWh |
Highly dependent on site conditions |
| LIFETIME | 30 y | 10 y | 50 y |
| TIME OF IMPLEMENTATION |
1 –2 y | 1 –3 y | 5 –7 y |
| SUPPLIER LOCALIZATION |
WORLD | 80% CHINA 20% WORLD |
WORLD |
Electrical Energy Storage (short duration)by ZOE Energy Storage |
Landscape![]() |
R&D Centre |
Manufacturing Plants(China) |
Digital Centre |
Nordic Center |
Warehouse |
Manufacturing Plants (Hungary) |
Manufacturing |
![]() |
The company operates advanced energy storage factories with 10GWh capacity in China and 6GWh in Europe, featuring automated Pack, PCS, and system integration lines. Equipped with cutting-edge technology and full testing capabilities, these facilities use an MES system to track production, materials, processes, and quality, boosting automation, intelligence, and flexibility to ensure top safety and quality standards. |
ZOE Global Product Series![]() |
C&I ESS Solutions![]() |
Utility ESS Solutions![]() |